Dillard High School

Fort Lauderdale, FL

Commercial Facility

Project Scope

CTC Mechanical successfully completed the installation of a new Trane rooftop HVAC package unit (RTU) at Dillard High School in Fort Lauderdale, Florida.
The project replaced an aging rooftop system to deliver improved cooling performance, energy efficiency, and long-term reliability for the educational facility.



- Safe removal of the existing rooftop unit and recovery of refrigerant per EPA standards.

- Installation of a new Trane high-efficiency rooftop unit with proper curb alignment and duct connection.

- Electrical and control wiring installation with complete startup testing.

- Condensate drain system installation using insulated PVC piping with vibration-isolated supports.

- System commissioning, refrigerant charge verification, and performance balancing.


quotesArtboard 1 copy 2

Working with CTC Mechanical Contractors was a seamless experience from start to finish. The team removed our old units and installed new  quickly, professionally, and with minimal disruption to our operations. The new system is running flawlessly — quieter, more efficient, and already reducing our energy costs. We couldn’t be happier with the results and highly recommend CTC Mechanical for any installation or upgrade projects.

Facility Manager