The Boca Raton Resort Hotel

Boca Raton, FL

Commercial Facility

Project Scope

CTC Mechanical Contractors completed a highly technical HVAC installation project involving the installation of linear slot diffusers on a ceiling more than 36 feet high. The scope included precise alignment, suspension, and integrationof the new diffusers into a complex architectural ceiling system within a large commercial facility.


Working at this elevation required specialized lift equipmentcustom mounting solutions, and strict adherence to safety protocols. Each diffuser was installed with millimeter accuracy to maintain both the architectural symmetry of the ceiling and the efficiency of the air distribution system.


In addition to the installation itself, the team ensured proper balancing of airflowsealing of duct connections, and testing of the HVAC performance to verify even temperature distribution throughout the space. Despite the challenges of height and access, the project was completed on schedule and without disruption to the client’s operations.


quotesArtboard 1 copy 2

Working with CTC Mechanical Contractors was a seamless experience from start to finish. The team removed our old units and installed new  quickly, professionally, and with minimal disruption to our operations. The new system is running flawlessly — quieter, more efficient, and already reducing our energy costs. We couldn’t be happier with the results and highly recommend CTC Mechanical for any installation or upgrade projects.

Facility Manager

Contact us any time