The Boca Raton Resort Hotel
Boca Raton, FL
Commercial Facility
Project Scope
For this project, CTC Mechanical Contractors completed a full replacement of outdated water source heat pumps with new high-efficiency BOSCH units. The scope of work included safe removal of the existing systems, supply and installation of modern equipment, and reconnection to the building’s current infrastructure.
Our team ensured that all new systems were seamlessly integrated with existing piping, electrical connections, and ductwork. Where possible, original components such as drain pans and ducts were retained to optimize efficiency and reduce costs.
The result is a modernized system that delivers improved energy efficiency, enhanced reliability, and greater comfort for the facility — all completed with minimal disruption to daily operations.
Working with CTC Mechanical Contractors was a seamless experience from start to finish. The team removed our old units and installed new quickly, professionally, and with minimal disruption to our operations. The new system is running flawlessly — quieter, more efficient, and already reducing our energy costs. We couldn’t be happier with the results and highly recommend CTC Mechanical for any installation or upgrade projects.
Facility Manager